HERPASA is at the final phase of the construction of an oil unloading unit in the port of La Coruña. The product is unloaded from the ship, stored in the storage area, and later loaded into tanker trucks.
The total storage capacity is 15,000m3 for the storage of molasses, palm oil, and fatty acids.